- Source
- reviewed-functional-microerps
- Source version
- reviewed-functional-microerps-2026-11-03
- Readiness
- Reviewed scope definition. Application implementation, migration and live availability are not verified by this catalogue import.
- Operating model
- A building contractor delivering client construction projects from tender and mobilization through measured progress, subcontract execution, handover and defect obligations.
- Feature modules
- 57
- Primary workflow
- Compose canonical functional MicroERPs; preserve each module operating trigger.
- Dependencies
- Shared Platform and applicable functional MicroERPs
- Enablement
- Apply each source operating trigger and user permissions; list membership is not automatic enablement.
- Direct functional MicroERPs
- 14
- Conditional common-pool MicroERPs
- 22
- Source assignments
- [{"key": "construction-tender-boq", "owner": "construction-management", "assignmentId": "ERP-33-M001", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-site-mobilization", "owner": "construction-management", "assignmentId": "ERP-33-M002", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-wbs-schedule", "owner": "construction-management", "assignmentId": "ERP-33-M003", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-drawings", "owner": "construction-management", "assignmentId": "ERP-33-M004", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-rfi", "owner": "construction-management", "assignmentId": "ERP-33-M005", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-submittals", "owner": "construction-management", "assignmentId": "ERP-33-M006", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-method-statements", "owner": "construction-management", "assignmentId": "ERP-33-M007", "necessity": "Conditional", "appliesWhen": "The contract or risk profile requires formal method statements and inspection plans.", "functionalProduct": "construction-quality-handover"}, {"key": "construction-site-diary", "owner": "construction-management", "assignmentId": "ERP-33-M008", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-measurement-book", "owner": "construction-management", "assignmentId": "ERP-33-M009", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-commercial-control"}, {"key": "construction-progress-claims", "owner": "construction-management", "assignmentId": "ERP-33-M010", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-commercial-control"}, {"key": "construction-retentions", "owner": "construction-management", "assignmentId": "ERP-33-M011", "necessity": "Conditional", "appliesWhen": "Contracts retain amounts or require performance security linked to project milestones.", "functionalProduct": "construction-commercial-control"}, {"key": "construction-mobilization-advances", "owner": "construction-management", "assignmentId": "ERP-33-M012", "necessity": "Conditional", "appliesWhen": "The contract includes mobilization or material advances.", "functionalProduct": "construction-commercial-control"}, {"key": "construction-change-orders", "owner": "construction-management", "assignmentId": "ERP-33-M013", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-commercial-control"}, {"key": "construction-subcontract-packages", "owner": "construction-management", "assignmentId": "ERP-33-M014", "necessity": "Conditional", "appliesWhen": "The contractor outsources construction packages to subcontractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-subcontract-measurements", "owner": "construction-management", "assignmentId": "ERP-33-M015", "necessity": "Conditional", "appliesWhen": "Subcontractors are paid by measured progress or certified work quantities.", "functionalProduct": "construction-commercial-control"}, {"key": "construction-site-materials", "owner": "construction-management", "assignmentId": "ERP-33-M016", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-labor-productivity", "owner": "construction-management", "assignmentId": "ERP-33-M017", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-plant-allocation", "owner": "construction-management", "assignmentId": "ERP-33-M018", "necessity": "Conditional", "appliesWhen": "Delivery uses owned or hired construction plant and equipment.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-material-testing", "owner": "construction-management", "assignmentId": "ERP-33-M019", "necessity": "Conditional", "appliesWhen": "Contract specifications require material testing or laboratory evidence.", "functionalProduct": "construction-quality-handover"}, {"key": "construction-inspection-holdpoints", "owner": "construction-management", "assignmentId": "ERP-33-M020", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-quality-handover"}, {"key": "construction-safety-observations", "owner": "construction-management", "assignmentId": "ERP-33-M021", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-work-permits", "owner": "construction-management", "assignmentId": "ERP-33-M022", "necessity": "Conditional", "appliesWhen": "Client or site rules require permits for specified activities.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-constraints", "owner": "construction-management", "assignmentId": "ERP-33-M023", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-weather-delays", "owner": "construction-management", "assignmentId": "ERP-33-M024", "necessity": "Conditional", "appliesWhen": "Weather or external interruptions materially affect schedule or contract claims.", "functionalProduct": "construction-project-delivery"}, {"key": "construction-price-escalation", "owner": "construction-management", "assignmentId": "ERP-33-M025", "necessity": "Conditional", "appliesWhen": "The construction contract includes an explicit price-escalation clause.", "functionalProduct": "construction-commercial-control"}, {"key": "construction-snags", "owner": "construction-management", "assignmentId": "ERP-33-M026", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-quality-handover"}, {"key": "construction-asbuilt-handover", "owner": "construction-management", "assignmentId": "ERP-33-M027", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-quality-handover"}, {"key": "construction-defects-liability", "owner": "construction-management", "assignmentId": "ERP-33-M028", "necessity": "Conditional", "appliesWhen": "The contract includes a defined defects-liability or post-completion service period.", "functionalProduct": "construction-quality-handover"}, {"key": "construction-final-account", "owner": "construction-management", "assignmentId": "ERP-33-M029", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "construction-commercial-control"}, {"key": "construction-bim-coordination", "owner": "construction-management", "assignmentId": "ERP-33-M030", "necessity": "Advanced", "appliesWhen": "Projects use coordinated BIM models with reliable revision and issue exchange.", "functionalProduct": "construction-project-delivery"}, {"key": "project-budget-control", "owner": "project-management", "assignmentId": "ERP-33-M031", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "project-management"}, {"key": "time-and-material-recovery", "owner": "project-management", "assignmentId": "ERP-33-M032", "necessity": "Conditional", "appliesWhen": "The engagement is time-and-material or reimburses documented effort and materials.", "functionalProduct": "project-management"}, {"key": "client-retainer-utilization", "owner": "project-management", "assignmentId": "ERP-33-M033", "necessity": "Conditional", "appliesWhen": "A maintenance or on-call construction agreement includes a recurring capacity allowance.", "functionalProduct": "project-management"}, {"key": "pass-through-cost-control", "owner": "project-management", "assignmentId": "ERP-33-M034", "necessity": "Conditional", "appliesWhen": "Third-party purchases or expenses are rechargeable to the client.", "functionalProduct": "project-management"}, {"key": "project-risk-issues", "owner": "project-management", "assignmentId": "ERP-33-M035", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "project-management"}, {"key": "project-dependency-control", "owner": "project-management", "assignmentId": "ERP-33-M036", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "project-management"}, {"key": "delivery-capacity-forecast", "owner": "project-management", "assignmentId": "ERP-33-M037", "necessity": "Advanced", "appliesWhen": "Multiple concurrent projects require forward capacity and scenario planning.", "functionalProduct": "project-management"}, {"key": "project-commercial-disputes", "owner": "project-management", "assignmentId": "ERP-33-M038", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "project-management"}, {"key": "engagement-suspension-termination", "owner": "project-management", "assignmentId": "ERP-33-M039", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "project-management"}, {"key": "customer-work-intake", "owner": "crm-and-customers", "assignmentId": "ERP-33-M040", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "customer-and-opportunity-management"}, {"key": "commercial-feasibility-review", "owner": "crm-and-customers", "assignmentId": "ERP-33-M041", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "customer-and-opportunity-management"}, {"key": "customer-work-portal", "owner": "project-management", "assignmentId": "ERP-33-M042", "necessity": "Conditional", "appliesWhen": "Customers need a self-service view of active orders, projects or service work.", "functionalProduct": "project-management"}, {"key": "customer-complaints", "owner": "service-operations", "assignmentId": "ERP-33-M043", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "helpdesk-and-support"}, {"key": "industry-data-bridge", "owner": "shared-platform", "assignmentId": "ERP-33-M044", "necessity": "Conditional", "appliesWhen": "The deployment connects to customer, vendor, device or specialist software systems.", "functionalProduct": "shared-platform"}, {"key": "procurement-order-control", "owner": "procurement-and-suppliers", "assignmentId": "ERP-33-M045", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "purchasing"}, {"key": "goods-receiving", "owner": "inventory", "assignmentId": "ERP-33-M046", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "stock-control-and-fulfilment"}, {"key": "stock-reservations", "owner": "inventory", "assignmentId": "ERP-33-M047", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "stock-control-and-fulfilment"}, {"key": "lot-traceability", "owner": "inventory", "assignmentId": "ERP-33-M048", "necessity": "Conditional", "appliesWhen": "Materials or finished goods require batch-level genealogy or customer traceability.", "functionalProduct": "inventory-quality-and-traceability"}, {"key": "stock-transfers", "owner": "inventory", "assignmentId": "ERP-33-M049", "necessity": "Conditional", "appliesWhen": "Stock moves between stores, branches, warehouses or work sites.", "functionalProduct": "stock-control-and-fulfilment"}, {"key": "supplier-returns", "owner": "procurement-and-suppliers", "assignmentId": "ERP-33-M050", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "supplier-recovery"}, {"key": "customer-owned-materials", "owner": "inventory", "assignmentId": "ERP-33-M051", "necessity": "Conditional", "appliesWhen": "Customers supply materials, components or equipment for processing.", "functionalProduct": "stock-control-and-fulfilment"}, {"key": "equipment-maintenance", "owner": "assets-and-facilities", "assignmentId": "ERP-33-M052", "necessity": "Conditional", "appliesWhen": "The operation depends on owned production, handling or service equipment.", "functionalProduct": "maintenance-management"}, {"key": "equipment-calibration", "owner": "assets-and-facilities", "assignmentId": "ERP-33-M053", "necessity": "Conditional", "appliesWhen": "Measurements rely on instruments with controlled calibration schedules.", "functionalProduct": "calibration-management"}, {"key": "quality-nonconformance", "owner": "governance-and-risk", "assignmentId": "ERP-33-M054", "necessity": "Core", "appliesWhen": "Construction quality defects require contained corrective work and acceptance evidence.", "functionalProduct": "quality-and-corrective-actions"}, {"key": "rework-control", "owner": "production", "assignmentId": "ERP-33-M055", "necessity": "Core", "appliesWhen": "Construction defects may require approved removal repair or reconstruction with cost attribution.", "functionalProduct": "manufacturing-execution"}, {"key": "capacity-planning", "owner": "project-management", "assignmentId": "ERP-33-M056", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "project-management"}, {"key": "job-costing", "owner": "project-management", "assignmentId": "ERP-33-M057", "necessity": "Core", "appliesWhen": "Applies to the stated reference model for Construction Contractors.", "functionalProduct": "project-management"}]